Contents 

Impressum
Introduction
Working in networks
Create project
Create new project
Open project
New project from template
Define project properties
Preferred teams
Define machine types that can be shared
Define machinery that can be shared
Define header and footer
Define format
Create user-defined fields
External links
Enter notes & links
Project overview
View favourites in the project
Portfolio overview
Create activities
Edit activities
Delete activities
Working with activity and subproject tables
Link activities
Edit link
Delete link
Enter activitiy properties
Define general activity properties
Assign roles
Assign teams
Assign employees
Allocate material
Allocate machine types
Allocate machinery
Check links
Define format
Fill in user-defined fields
Enter notes & links
Split activities
Split activities into places / rooms
Create subprojects
Insert subprojects from file
Edit subprojects
Delete subprojects
Enter subproject properties
Assign activities to subprojects
Take over start and finish dates of a project from activities
Identify roles from the assignation of employees
Identify machine types from machine allocation
Improve presentation of the project
Optimise a project
Assign employees to activities
Save project
Save project as template
Import
Import from MS Project XML
Import text file CSV format
Export
MS Project XML
Export to MS Excel
Project portfolio
New project portfolio
Open a project portfolio
Cross-project links
Project view
Gantt chat
Variance analysis
Network diagram
Gantt networt chart
Resource histogram
Role usage
Project-specific role usage
Team usage
Project-specific team usage
Employee usage
Project-specific employee usage
Human Resource Capacity Leveling
Project-specific Human Resource Capacity Leveling
Human Resource Capacity Levelingl with additional resource diagram
Material requirement
Project-specific material requirement
Machine types Usage
Project-specific machine types
Machinery Usage
Project-specific machinery
Capacity alignment machines
Project-specific capacity alignment machines
Capacity alignment for machines with additional resource diagram
Cost chart
Additional resource diagram
Additional cost chart
Filter
Project controlling
Add baseline
Delete baselines
Variance analysis
Control of project financing
Project management
Identify resources
Create new resource pool file
Select other resource pool
Set and adjust calendars
Set and adjust roles
Set and adjust teams
Set and adjust employees
Set and adjust materials
Set and adjust machine types
Set and adjust machinery
Set and adjust project categories
Set and adjust project status
Resource allocation
Assign activities to a role in the view Role utilization
Assign activities to a team in the view Team utilization
Assign activities to an employee in the Capacity alignment personnel
Assign activities to an employee in the view Employee utilization
Assign activities to a material in the view Material requirements
Assign activities to a machine type in Machine type utilization
Assign activities to machines in the view Machine utilization
Assign resources to activities
Assign employees to activities
Identify roles from the assignation of employees
Identify machine types from machine allocation
Optimise a project
XML
Reporting
Generate report
Edit report
Reports available for project schedule
Reports available for project resources
Reports available for resource pool
Printing
Print preview
Print view
Print report
Appendix
Appendix A: Shift to resource pool
Manual selection of calendar
Manual selection of roles
Manual selection of teams
Manual selection of employees
Manual selection of materials
Manual selection of machine types
Manual selection of machinery
Manual selection of project category
Manual selection of project status
Appendix B: Adjustments of the program environment
Adjusting default parameter
Adjusting the size of the different objects
Adjusting the font of the different objects
Adjusting the colour of the different objects
Adjusting the line type of the different objects
Adjusting the XML settings for the presentation of the project in the internet/intranet
Adjusting the SOAP settings for the Rillsoft Integration Server (RIS)
Adjusting the directories for reports, projects and templates
Adjusting the views and several object properties
Appendix C: Report structure
Shape structure
Table structure
Tables for project schedules
Tables for project resources
Tables for resource pool
Variables

Rillsoft Project Online Help

Prev Next

Assign employees to activities


Requirements: In order to assign employees to activities, you need to first assign personnel resources in the form of roles.

In order to semi-automatically assign employees to activities, you do the following:

  1. Select the menu item Project / Assign employees to activities.
    The dialogue box Assigning employees - Step 1 of 3: Selection of employees opens.

    The list includes all the employees you can assign to activities or reassign to other activities by selecting them in Step 1.

    Employees are grouped together in teams, while employees not being part of a team are shown at the lower end of the list.

    • Calendar - predefined calendar of the employee.
    • Week - average working hours per week.
    • On-call - percentage of the possible working capacity of an employee within project duration, adjusted for the reported non-working days (holidays/sickness).
  2. Click the check boxes of the employees you would like to assign to activities in the column No..
    You may also click on the button Select all employees.
  3. Click on the button Continue.
    The dialogue box Assigning employees - Step 2 of 3: Selection of activities opens.

    This list provides you with all the activities you can later assign employees to.

    • The activities provided for selection reflect the structure of the project.
  4. Click on the check boxes for the activities to whom you want to assign employees.
    You may also click on the button Select all employees.
  5. Click on the button Continue.
    The dialogue box Assigning employees - Step 3 of 3: Assigning employees to activities opens.

    This list includes all the selected employees you can assign to the selected activities in Step 3.

    Employees can be assigned to an activity if their role and qualification meets the demands of the activity.

    Assignations are automatically evaluated and have an effect on succeding activities (white: assignation possible, grey: assignation not possible as already covered by an employee, red: assignation possible, but timing conflicts occur).

    • On-call - percentage of the possible working capacity of an employee within activity duration, adjusted for the reported non-working days (holidays/sickness).
    • Role - role of the employee.
    • Effort - number of required employees for the activity and effort.
    • Start - scheduled start of the activity.
    • Finish - scheduled finish of the activity.
  6. Click on the check box for the activity you want to assign to an employee (for instance, because the employee can be on-call for 100% of the total activity duration).
    Assignation options are dynamically adjusted.

    Note: When assigning, we recommend you using the following strategy to avoid overload of resources: first assign activities to employees who can cover activities at 100% (column On-call) and productivity at 100%.

  7. Repeat Step 6 if necessary.
    You may also click on the button Assign employees automatically.
  8. Click on the button Finish.

Important! Possible conflicts and overloads are indicated in red, and there is no automatic assignation.

See also:

Setting and adjusting roles,
Setting and adjusting teams,
Setting and adjusting employees,
Setting and adjusting materials,
Setting and adjusting machine types,
Setting and adjusting machinery.