Project-specific machine types Usage
Applications for the view Project-specific machine types:
- Display of the demand for machine types per project.
- Ressource allocation from the perspective of machine
types.
- Project-specific calculation of the load for every single
machine type .
- Project-specific calculation of the total efforts for and total
costs of every single machine type.
- Project-specific visualisation of the allocation of machine
types in activities.
You can use the view Project-specific machine types Usagefor
the following:
- Assign selected activities to a machine type.
- Analyse the load of a machine type for each of the projects by
help of filter settings.
- Change the timescale.
- Quick access to the resource pool.
Context menu in the view Project-specific machine types
Usage
If you open the context menu on the Machine types Usage,
the following commands appear:
- Expand/collapse all machine types – Depending on the
preferred view, you can expand/collapse all machine types.
- Show maximum per time unit – The maximum required number
of machine resources for each of the machine groups - machine types
per day, week, etc.
- Show average per time unit – The average required number
of machine type resources per day, week, etc.
- Show effort per time unit – Planned effort in machine
hours (or days, respectively) per day, week, etc.
- Group by machine type – Presents the machine types
belonging to a machine group in one row with total load.
- Place activities in one row, if possible - Displays the
activities entered for a machine type in one row, if possible.
For better presentation, activities overlapping in time are shown
in separate rows.
- Display in reference to subprojects - The loads of
machine types is not shown for the overall project, but for each of
the subprojects seperately. However, only those subprojects are
considered that are on the level immediately below the overall
project.
- Sort machine types – All displayed machine types can be
sorted along number, name or code.
- Sort activities – All displayed activities can be sorted
along number, start date and finish date.
- Unhide total load - Total load for all machine types in
the project per day, week, etc.
- Additional resource diagram – You can view an additional
resource diagram in the lower area of the window Machine
Types.
- Additional break-even chart – You can view an additional
break-even chart in the lower area of the window Machine
Types.
If you open the context menu in the Activity row, the
command Group is not shown, but the following commands are
available:
- Share - The selected activity shares the machine type
together with other activities.
- Use exclusively - The selected activity uses the machine
type exclusively.
|