Create activities
Edit activities
Delete activities
Working with activity and subproject tables
Link activities
Edit link
Delete link
Enter activitiy properties
Define general activity properties
Assign roles
Assign teams
Assign employees
Allocate material
Allocate machine types
Allocate machinery
Check links
Define format
Fill in user-defined fields
Enter notes & links
Split activities
Split activities into places / rooms
Create subprojects
Insert subprojects from file
Edit subprojects
Delete subprojects
Enter subproject properties
Assign activities to subprojects
Take over start and finish dates of a project from activities
Identify roles from the assignation of employees
Identify machine types from machine allocation
Improve presentation of the project
Optimise a project
Assign employees to activities
Save project
Save project as template
Import
Import from MS Project XML
Import text file CSV format
Export
MS Project XML
Export to MS Excel
Project portfolio
New project portfolio
Open a project portfolio
Cross-project links
Project view
Gantt chat
Variance analysis
Network diagram
Gantt networt chart
Resource histogram
Role usage
Project-specific role usage
Team usage
Project-specific team usage
Employee usage
Project-specific employee usage
Human Resource Capacity Leveling
Project-specific Human Resource Capacity Leveling
Human Resource Capacity Levelingl with additional resource diagram
Material requirement
Project-specific material requirement
Machine types Usage
Project-specific machine types
Machinery Usage
Project-specific machinery
Capacity alignment machines
Project-specific capacity alignment machines
Capacity alignment for machines with additional resource diagram
Cost chart
Additional resource diagram
Additional cost chart
Filter
Project controlling
Add baseline
Delete baselines
Variance analysis
Control of project financing
Project management
Identify resources
Create new resource pool file
Select other resource pool
Set and adjust calendars
Set and adjust roles
Set and adjust teams
Set and adjust employees
Set and adjust materials
Set and adjust machine types
Set and adjust machinery
Set and adjust project categories
Set and adjust project status
Resource allocation
Assign activities to a role in the view Role utilization
Assign activities to a team in the view Team utilization
Assign activities to an employee in the Capacity alignment personnel
Assign activities to an employee in the view Employee utilization
Assign activities to a material in the view Material requirements
Assign activities to a machine type in Machine type utilization
Assign activities to machines in the view Machine utilization
Assign resources to activities
Assign employees to activities
Identify roles from the assignation of employees
Identify machine types from machine allocation
Optimise a project
XML
Reporting
Generate report
Edit report
Reports available for project schedule
Reports available for project resources
Reports available for resource pool
Printing
Print preview
Print view
Print report
Appendix
Appendix A: Shift to resource pool
Manual selection of calendar
Manual selection of roles
Manual selection of teams
Manual selection of employees
Manual selection of materials
Manual selection of machine types
Manual selection of machinery
Manual selection of project category
Manual selection of project status
Appendix B: Adjustments of the program environment
Adjusting default parameter
Adjusting the size of the different objects
Adjusting the font of the different objects
Adjusting the colour of the different objects
Adjusting the line type of the different objects
Adjusting the XML settings for the presentation of the project in the internet/intranet
Adjusting the SOAP settings for the Rillsoft Integration Server (RIS)
Adjusting the directories for reports, projects and templates
Adjusting the views and several object properties
Appendix C: Report structure
Shape structure
Table structure
Tables for project schedules
Tables for project resources
Tables for resource pool
Variables

Rillsoft Project Online Help

Prev Next

Project-specific Human Resource Capacity Leveling

Once the scheduling of roles and machine types is completed, the view Capacity alignment personnel will help you estimate whether there is sufficient personnel capacities to execute the project or where potential bottlenecks may occur.

The Project-specific capacity alignment personnel is determined by the number of employees, their qualifications, time of employment and place of work (project, subproject). The Capacity alignment personnel not only shows the number of the required hours and days for employees and roles, but also indicates ecxess and shortfall (supply minus demand = contingency). Moreover, the view Project-specific capacity alignment personnel helps you detect employees that match the requirements of the demand.

Employees whose employee hours / days are in boldface, have already been assigned to this activity. If they are displayed in both boldface and red colour, you have an assignation conflict, which means that the employee has been assigned to several activities at one time.

You can use the Project-specific Human Resource Capacity Leveling to do the following:

  • Detect overloaded resources as well as the scale and cause for this event.
  • View the working capacity for each of the resource role per project.
  • Calculate the numbers of work that have been assigned to the individual employees per project.
  • Determine the time the employee is available for additional assignments.

Context menu in the view Human Resource Capacity Leveling

  • Expand/collapse all resources – Depending on the preferred view, you can expand/collapse all resources.
  • Show maximum per time unit – The maximum required number of personnel resources for each of the roles / qualifications per day, week, etc.
  • Show effort per time unit – Planned effort in employee hours (or employee days, respectively) per day, week, etc.
  • Group by roles – Presents the qualifications belonging to a role in one row with total utilization.
  • Place activities in one row, if possible - Displays the activities done by one role in one row, if possible.
    For better presentation, activities overlapping in time are shown in separate rows.
  • Display in reference to subprojects - The resource utilization is not shown for the overall project, but for each of the subprojects separately. However, only those subprojects are considered that are on the level immediately below the overall project.
  • Unhide activities – Depending on the preferred view, you can hide or unhide activities.
  • Unhide employees – Depending on the preferred view, you can hide or unhide employees.
  • Sort roles – All displayed roles can be sorted along number, name or code.
  • Sort activities – All displayed activities can be sorted along number, start date and finish date.
  • Sort employees – All displayed employees can be sorted along number, name, code or cost per hour.
  • Additional resource diagram – You can view an additional resource diagram in the lower area of the window Role utilization.
  • Additional break-even chart – You can view an additional break-even chart in the lower area of the window Role utilization.