Project-specific machinery Usage
Applications for the view Project-specific machinery
Usage:
- Assign selected activities to a machine.
- Display of the portfolio's demand for machines per
project.
- Display of the project's demand for machines.
- Calculation of the load of every single machine.
- Calculation of the total efforts for and total costs of every
single machine.
- Visualisation of the allocation of machines in activities.
You can use the view Project-specific machinery Usagefor the
following:
- Analyse the load of a machine by help of filter settings.
- Change the timescale.
- Quick access to the resource pool.
Context menu in the view Project-specific machinery Usage
If you open the context menu on the Machinery row, the
following commands appear:
- Expand/collapse all resources – Depending on the
preferred view, you can expand/collapse all resources.
- Show maximum per time unit – The maximum required number
of machine resources for each of the machine groups - machine types
per day, week, etc.
- Show average per time unit – The average required number
of machine resources per day, week, etc.
- Show effort per time unit – Planned effort in machine
hours (or machine days, respectively) per day, week, etc.
- Group by machines – Presents the machine types belonging
to a machine group in one row with total load.
- Place activities in one row, if possible - Displays the
activities entered for a machine in one row, if possible.
For better presentation, activities overlapping in time are shown
in separate rows.
- Display in reference to subprojects - The loads of
machines is not shown for the overall project, but for each of the
subprojects separately. However, only those subprojects are
considered that are on the level immediately below the overall
project.
- Sort machines – All displayed machines can be sorted
along number, name or code.
- Sort activities – All displayed activities can be sorted
along number, start date and finish date.
- Unhide total load - Total load for all machines in the
project per day, week, etc.
- Additional resource diagram – You can view an additional
resource diagram in the lower area of the window Machinery.
- Additional break-even chart – You can view an additional
break-even chart in the lower area of the window Machinery.
If you open the context menu on the Activity row, the
following commands appear:
- Use commonly - The selected activity shares the machine
with other activities.
- Use exclusively - The selected activity uses the machine
exclusively.
|