Contents 

Impressum
Introduction
Working in networks
Create project
Create new project
Open project
New project from template
Define project properties
Preferred teams
Define machine types that can be shared
Define machinery that can be shared
Define header and footer
Define format
Create user-defined fields
External links
Enter notes & links
Project overview
View favourites in the project
Portfolio overview
Create activities
Edit activities
Delete activities
Working with activity and subproject tables
Link activities
Edit link
Delete link
Enter activitiy properties
Define general activity properties
Assign roles
Assign teams
Assign employees
Allocate material
Allocate machine types
Allocate machinery
Check links
Define format
Fill in user-defined fields
Enter notes & links
Split activities
Split activities into places / rooms
Create subprojects
Insert subprojects from file
Edit subprojects
Delete subprojects
Enter subproject properties
Assign activities to subprojects
Take over start and finish dates of a project from activities
Identify roles from the assignation of employees
Identify machine types from machine allocation
Improve presentation of the project
Optimise a project
Assign employees to activities
Save project
Save project as template
Import
Import from MS Project XML
Import text file CSV format
Export
MS Project XML
Export to MS Excel
Project portfolio
New project portfolio
Open a project portfolio
Cross-project links
Project view
Gantt chat
Variance analysis
Network diagram
Gantt networt chart
Resource histogram
Role usage
Project-specific role usage
Team usage
Project-specific team usage
Employee usage
Project-specific employee usage
Human Resource Capacity Leveling
Project-specific Human Resource Capacity Leveling
Human Resource Capacity Levelingl with additional resource diagram
Material requirement
Project-specific material requirement
Machine types Usage
Project-specific machine types
Machinery Usage
Project-specific machinery
Capacity alignment machines
Project-specific capacity alignment machines
Capacity alignment for machines with additional resource diagram
Cost chart
Additional resource diagram
Additional cost chart
Filter
Project controlling
Add baseline
Delete baselines
Variance analysis
Control of project financing
Project management
Identify resources
Create new resource pool file
Select other resource pool
Set and adjust calendars
Set and adjust roles
Set and adjust teams
Set and adjust employees
Set and adjust materials
Set and adjust machine types
Set and adjust machinery
Set and adjust project categories
Set and adjust project status
Resource allocation
Assign activities to a role in the view Role utilization
Assign activities to a team in the view Team utilization
Assign activities to an employee in the Capacity alignment personnel
Assign activities to an employee in the view Employee utilization
Assign activities to a material in the view Material requirements
Assign activities to a machine type in Machine type utilization
Assign activities to machines in the view Machine utilization
Assign resources to activities
Assign employees to activities
Identify roles from the assignation of employees
Identify machine types from machine allocation
Optimise a project
XML
Reporting
Generate report
Edit report
Reports available for project schedule
Reports available for project resources
Reports available for resource pool
Printing
Print preview
Print view
Print report
Appendix
Appendix A: Shift to resource pool
Manual selection of calendar
Manual selection of roles
Manual selection of teams
Manual selection of employees
Manual selection of materials
Manual selection of machine types
Manual selection of machinery
Manual selection of project category
Manual selection of project status
Appendix B: Adjustments of the program environment
Adjusting default parameter
Adjusting the size of the different objects
Adjusting the font of the different objects
Adjusting the colour of the different objects
Adjusting the line type of the different objects
Adjusting the XML settings for the presentation of the project in the internet/intranet
Adjusting the SOAP settings for the Rillsoft Integration Server (RIS)
Adjusting the directories for reports, projects and templates
Adjusting the views and several object properties
Appendix C: Report structure
Shape structure
Table structure
Tables for project schedules
Tables for project resources
Tables for resource pool
Variables

Rillsoft Project Online Help

Prev Next

Set and adjust employees

Rillsoft Project provides for a very flexible management of employees. You can assign several different roles, team memberships, costs and productivity to employees.

Note: We recommend you creating teams before defining employees.

In order to set and adjust employees, you do as follows:

  1. Select the menu item Tools / Resource pool.
    The dialogue box Resource pool opens.
  2. Select the tab Employees.

  3. Create a new group or a new employee by clicking on the button New group or, in the row that is marked with an asterisk (*), enter a new employee name in the column Name.
  4. Enter the property of an employee (a new role or team membership) already in this group in the row (columns Working group – team and Role - qualification). You can enter additional properties of the employee directly into the empty row below in the column Working group - team and Role - qualification, while the group description is automatically copied.

    Note: To change the name of the group, you need to do this in the first group row first, which automatically transfers the group name to all the other stored material types.

  5. Enter a specific value into the column Code to exchange data with other applications.
  6. From the drop down list Calendar, select the calendar that should apply for this employee. If you have not selected a calendar, the program searches for a valid calendar in the following order. Team calendar, activity calendar and project calendar.
  7. Enter the date the employee has entered the company in the field Entry.
  8. Enter the date the employee has left the company in the field Leaving.
  9. Enter the non-working days of the employee (job trainings, workshops, etc.) into the field Non-working days. Note: The non-working days entered here will be added to those defined in the team. (Example for a definition of non-working days: 18.03.05-22.04.05; 25.05.05; 08.06.05-17.06.05).
  10. Select the team which you want the employee assign to in the drop down list Working group - team.
  11. Select the role which you want to assign to the employee in the drop down list Role - qualification.
  12. Enter a different value for the calculated productivity of an employee in percent in the field Productivity.
  13. Enter a different value for the calculated hourly rate of an employee (for instance, from the role definition) in the field Costs.
  14. After a particular date, you can enter either a coefficient for an existing unit price or a new unit price per hour of the employee into the field Cost adjustment.
  15. If you like, enter a note into the field Notes.
  16. Click on the button OK.

Assign additional roles, teams, costs and productivity to one employee

If you want to assign a different role along with its different cost rate to an employee, do as follows:

  1. Enter the different value into the row of the employee directly below (no asterisk) in the corresponding column.

    Caution: Take care that you do not define this employee in another row, which features an asterisk, because this may cause inconsistencies within the project.

Import / export of employees

Click on the button Export to export a resource to a TXT file or on the button Import to import resources.

Import / export fields:

  • [ID]
  • [Name](required field)
  • [Code]
  • [Calendar]
  • [Entry date]
  • [Leaving date]
  • [Non-working days]
  • [Team]
  • [Role]
  • [Productivity]
  • [Costs]
  • [Cost adjustment]
  • [Notes]

The individual fields are separated by a hash key "#".

Example of an import file (only employee names and the corresponding hourly rates are imported):
  #Alfgot Zeller#########20.00##
  #Alex Harrison#########30.00##
  #Uwe Gibbons#########35.00##

Note:

  • You can search for employees in the field Filter. Enter the search phrase (or a part of it) into the field.

See also:

Setting and adjusting calendars,
Setting and adjusting roles,
Setting and adjusting teams,
Setting and adjusting materials,
Setting and adjusting machine types,
Setting and adjusting machinery.